A * Performance test: whether the exhaust volume, exhaust pressure, power, energy efficiency ratio, etc. meet the standards.
* Safety test: pressure vessel strength test, safety valve opening and closing pressure, electrical safety (grounding, insulation resistance, etc.).
* Operation test: continuous load operation (usually 4-8 hours), check whether the vibration, noise, and temperature rise are normal.
* Air tightness test: no leakage in pipelines, joints, and gas tanks (commonly used soapy water or nitrogen leak detection).
* Control system verification: whether the automatic start and stop, pressure regulation, and alarm functions (such as overpressure and overheating) are sensitive.